TOMORROW NIGHT — St. Louis Cardinals vs. Springfield Cardinals Exhibition Game — The two cities this site serves, sharing the same diamond. See Springfield projects →

Original Photography

Busch Stadium III — Construction Documentation

Three years. Hundreds of visits. Thousands of photographs. Beginning on Day 1 of demolition, Gregory Woodruff documented every phase of Busch Stadium III's construction — from the moment the final light poles of the old park came down to the ribbon-cutting on Opening Day 2006. Standing at the south end of the old stadium, at the exact spot where home plate would sit in the new park, Woodruff photographed something no construction photographer had ever captured at any other Major …

Started: 2004 Completed: 2006 28 Photos 700 Clark Ave, St. Louis, MO

December 27, 2003

4 photos Winter
Busch Stadium III construction, December 27, 2003

The photograph depicts a street-level view of the construction site and surrounding area near Busch Stadium III, at 700 Clark Ave, taken on December 27, 2003. Below is a detailed description of the visible elements: ### **Foreground and Immediate Surroundings** 1. **Sidewalk and Landscaping:** - A portion of a concrete sidewalk is visible in the foreground with small bushes and landscaping adjacent to it. The bushes appear somewhat overgrown and feature sparse areas. - Some debris is visible near the sidewalk, including what appears to be an orange construction cloth or marker. 2. **Brick Pillars and Fencing:** - Short brick pillars are integrated into sections of black metal fencing, forming a boundary. The fence encloses a portion of the construction area or nearby parking lot. 3. **Yellow Bollard:** - A yellow bollard, possibly serving as a protective barrier, stands near the edge of the sidewalk in the foreground. 4. **Street Signage:** - A "No Parking" sign is mounted to the left side of the image on a wooden pole. Below the sign, there appears to be additional text, although not clearly readable. - Other road signs are visible further down the street, including one located near the traffic cones and barriers. ### **Midground Construction Elements** 1. **Road Surface:** - The road is asphalt, with some visible construction markings highlighted in orange paint. - Traffic cones and temporary barriers are placed along the road and near entrances, indicating work in progress and rerouting. 2. **Construction Signs:** - One prominent construction sign is visible reading "Centex Construction," the name of the contractor. It is mounted on a post, surrounded by fencing and construction barricades. 3. **Equipment:** - In the midground, some construction equipment or materials are noticeable in the fenced area. While specific equipment types aren't apparent, cones and barriers dominate the area. ### **

Busch Stadium III construction, December 27, 2003

Based on the image provided, here is a detailed factual description of the construction scene: ### **Overview of Construction Area:** 1. **Structural Elements:** - Multiple concrete overpass structures are visible in the image, likely part of a bridge or highway system. - The overpasses include columns and beams, with some aged and worn surfaces noticeable on the concrete. - A height restriction sign is visible under one of the overpasses, stating "14 FT 5 IN⇅." 2. **Traffic and Construction Equipment:** - Orange safety barrels (possibly traffic barrels) are placed along the construction zone; several are on top of bright orange mesh fencing. - Orange mesh fencing is used to demarcate boundaries or redirect pedestrians/vehicles. - There is a rectangular orange construction sign that reads "ROAD CLOSED AHEAD." 3. **Construction Materials:** - Gravel, debris, and construction waste piles are scattered across the area beneath the overpass structure. - Some cones and additional fencing materials are placed for further safety measures. --- ### **Environmental and Surroundings:** 1. **Landmarks and Nearby Structures:** - A large, possibly multistory building is visible to the left in the background; its windows and external façade are discernible. - A transmission tower or construction crane can be seen towards the middle-right of the frame, indicating an ongoing large-scale construction project. - Part of another elevated highway or roadway curves up to the right side of the image. 2. **Street and Signage:** - No specific street signs are visible other than the construction warning signage mentioned above. - General utilities related to construction signage dominate the foreground. --- ### **Lighting and Time of Day:** 1. **Lighting Conditions:** - The lighting in the scene suggests it was taken during sunrise or sunset based on the angle of the shadows and the golden light visible. - The foreground appears darker due to shadowing

Busch Stadium III construction, December 27, 2003

This image shows the construction site of Busch Stadium III in downtown St. Louis, Missouri, captured on December 27, 2003. Below is a detailed description: ### **Construction Elements** 1. **Ground Surface**: The foreground shows an asphalt-paved area, likely part of a parking lot or temporary staging ground for construction. Painted parking stripes are visible, suggesting this area was previously designated for parking. 2. **Yellow Bollards**: There are several yellow bollards and pylons scattered around the construction site, likely used to restrict vehicle movement or mark specific zones. 3. **Orange Netting**: Bright orange construction netting lines the periphery of the site, acting as a temporary barrier or safety measure around the active area. 4. **Unfinished Structure (Foreground, Right)**: A large, partially demolished or under-construction stadium structure on the right side of the image displays concrete columns and steel beams. This appears to be the existing Busch Stadium undergoing refurbishment or demolition. 5. **Excavator and Other Equipment**: A distinct excavator is visible near the stadium structure on the right side. Further construction equipment may also be present, but they are less distinct. ### **Surrounding Architecture and Landmarks** 1. **Edward Jones Dome**: Not distinctly visible in this photo but nearby, Busch Stadium is located amidst a notable cluster of downtown buildings and landmarks. 2. **Modern Building Facades**: - A tall, light-gray or beige skyscraper in the background resembles the "United States Court House and Custom House". - A shorter red-brick building in the middle of the image is notable and features classic architectural accents, potentially a historic site or office building. - The whitish building and parking structures are farther in the background. 3. **Gold-Tinted Building**: - A tall, gold-tinted office building is prominent in the left background, possibly a reflective glass skyscraper. ### **Street Signs and

Busch Stadium III construction, December 27, 2003

The photograph provides a view of the construction site and surrounding area during the Busch Stadium III project on December 27, 2003, located at 700 Clark Ave. Below is a detailed description: ### **Construction Elements:** 1. **Concrete Barriers:** - Concrete barriers with alternating white and yellow paint stripes form a separation or boundary along a paved construction area. - These barriers highlight a temporary construction zone on the roadway. 2. **Orange Safety Mesh Fence:** - A visible orange mesh fence runs parallel to the barriers, marking the construction site's boundary. This type of fencing is typically used to highlight restricted or hazardous areas to pedestrians and vehicles. 3. **Portable Restroom:** - A green portable restroom is visible in the background of the construction zone. It is commonly provided for workers' use at active construction sites. 4. **Signage in Construction Zone:** - A white sign is visible in the construction area. The text is too small to be discerned but likely provides project-related information or instructions. ### **Equipment:** - There is no heavy machinery or specialized construction equipment visible in this specific view. The scene appears to depict preliminary site preparation or roadway adjustments. ### **Infrastructure and Landmarks:** 1. **Highways and Overpasses:** - Elevated highways or overpasses, supported by concrete columns, dominate the background. These structures suggest nearby city infrastructure. 2. **Buildings in the Background:** - There are industrial buildings and architectural features beyond the construction zone. Some structures appear to have visible glass windows. 3. **Utility Poles and Traffic Lights:** - Utility poles and traffic lights are visible, indicating an urban area with vehicular traffic infrastructure. ### **Street Details:** 1. **Pavement Markings:** - Lane markings visible on the asphalt show white lines and a turning arrow in one lane. These markings help guide traffic movement during construction. 2. **Yellow Corner C

Share This Gallery

Share on Facebook Share on X Share on LinkedIn

After posting to Facebook, copy the post URL and paste it into the admin under Projects → Busch Stadium III — Construction Documentation → Facebook Post URL so this button links directly to your post.